Requirement
The Water requirement will be about 26 MGD
Strategy:
The project location being with in 5 kms from Godavari
River the required water will be drawn from the Godavari
River.
Power Requirement:
The Power requirement will be 35 MW Consumption, A power
station of 80 MW (2 x 40) capacity is considered for the
project.
Signed Power Purchase Agreement (PPA) with Power
Trading Corporation (PTC) for excess Power.
Strategy:
The Power requirement would be met 80% by captive power
generation and the remaining 20% from Grid or as per the
Policy stipulations of the State Government.
Fuel Requirement:
Two types of fuels are required for the project, viz.,.
Coal and Furnace Oil. Coal requirement would be about
600 to 700 TPD
Furnace oil requirement will be 24 M3 per day
Alternative
Strategy:
Government of Andhra Pradesh has recommended to
allocate natural gas from States’ Quota. |